● Prepare technical Interior Design (ID) detailed drawings, fabrication drawings, production drawings, as-built drawings and other related drawings.
● Prepare bill of quantities for drawings produced.
● Overall design coordination for all trades including architectural, M&E, and ID work.
● Ensure the design process recognizes local legislation, standards and codes of practice, where appropriate.
● Strive to eliminate health and safety risks in the design and financial risks during construction.